Project profile
Santa Vitoria Thermal Power Plant (Biomass)
Owner’s Engineer
Iqony Solutions do Brasil was hired by ERB to perform the following services: owner's engineering and commissioning support.
The plant consists of a cogeneration project with 250 tons/h of steam, 43 MWe of generation. Utilities delivered also include LP steam, compressed air, demineralized water, cooling water and effluents treatment.
Installed capacity | 43 MW + 250 t/h steam |
Commissioning | July 2014 - April 2015 (COD) |
Customer | ERB - Energia Renováveis do Brasil |
Execution of SES services | 2013 - 2015 |